How to Calculate Rebar Welding Capacity: Butt Welds & Fillet Splices

Pick a bar, pick a weld, and read the honest number. The calculator computes the weld's capacity and the bar's yield capacity side by side, tells you which one governs, and applies the AWS D1.4 minimum weld length — the same math the guide below walks line by line.

⚡ Butt & Fillet Welds📐 Live WELD vs BAR📏 AWS D1.4 Minimums

Rebar Weld Capacity Calculator — weld vs bar, live

1 inmin 3.75 in (AWS D1.4 for #6)12 in
WELD CAPACITY F
18.48 kips
0.6 × Exx × A_bar
BAR TENSION T
26.40 kips
0.44 sq in × 60 ksi
WELD vs BAR
WELD GOVERNS
orange = weld · green = bar
WELD vs BAR YIELD
70%
weld is the weak link
HOW THE SPLICE IS CHECKED — LIVE FORMULAS
F = 0.6 × Exx × A_bar = 0.6 × 70 × 0.44 = 18.48 kips
T = A_bar × fy = 0.44 × 60 = 26.40 kips
governing = min(F, T) = 18.48 kips → WELD governs (70% of bar yield)
min length = max(5d, 1 in) = max(3.75 in, 1 in) = 3.75 in

Read this honestly: a flush butt check on the 0.6Fexx basis lands below bar yield — full-strength welded splices use complete-joint-penetration bevel groove welds with matching filler, designed to develop ≥125% of fy per ACI splice rules and detailed per AWS D1.4.

Two #6 bars meet in the middle of a column cage, the lap zone is too congested to tie, and the detailer has written "weld splice — see AWS D1.4" on the drawing. What does that weld actually have to carry, how long must it be, and which electrode goes in the stinger? Rebar welding calculation answers all three with two short formulas: the weld's working capacity F = 0.6 × E × (throat geometry) and the bar's yield capacity T = A_bar × fy. Put the two side by side and the governing side of the splice falls out immediately — usually the weld on a simple butt joint, almost never on a two-sided fillet. The calculator above runs both checks live for bars #3 through #8, Grades 40–75, E60 or E70 electrodes; the sections below walk every number, every minimum, and the AWS D1.4 rules that keep the weld from cracking six months after the pour.

The Welding vs Lap Splice Decision

A lap splice is the default splice in rebar work because it needs no skill and no equipment: lay the two bars alongside each other for the required lap length and tie them, and concrete bond does the rest. The price is steel. A lap runs 30–60 bar diameters depending on the code path, class of splice, and concrete strength, which on a #6 means roughly 22–36 inches of doubled bar — steel that occupies space, congests the joint, and carries load in only one of its two layers. The full arithmetic is in how to calculate rebar lap length, and it is the same tension-development math that governs every other bond issue on the site.

Welding attacks the problem from the other direction: the force crosses through weld metal instead of concrete bond, so the bars need no overlap at all. That saves the lap steel and the congestion, and it buys a splice whose capacity you can compute on a napkin — which is exactly what the calculator at the top of this page does. What welding costs is skill, procedure, and verification, and the comparison table below is where every contractor decides which currency they would rather pay.

AspectLap spliceWelded splice
Steel consumed30–60 bar diameters of extra bar per splice — a #6 lap burns roughly 2.5–3.8 lb of steel that carries load nowhereNearly zero — bars butt end-to-end or sit flush side by side, and the splice adds no member length
LaborAny rodman ties it in minutes; no qualification, no consumables, no weather limitsAWS D1.4-qualified welder, a written WPS, electrodes in rod ovens, and setup time per joint
Strength guaranteedConcrete bond over the lap develops the bar — it works because cover and spacing are rightWeld metal capacity F = 0.6 × E × throat geometry, checked directly against bar yield T = A_bar × fy
InspectionVisual — lap length, ties, and spacing checked against the placing plan100% visual per AWS D1.4, plus NDT/UT on critical groove welds where the spec calls for it
Best use#3–#6 bars, slabs, footings, walls — everyday work where steel is cheaper than skill#7+ bars, congested columns and joints, cages that must not grow, and splices to structural steel

Read the last row first, because it settles most jobs: if the bars are #6 or smaller and the joint is not congested, the lap wins on pure economics and the welded splice is a specialty tool. Where welding earns its keep is the set of problems laps cannot solve — a #8 column cage where a 40-inch lap doubles the steel in a 24-inch-wide column, a splice to a structural steel plate where there is no second bar to lap with, and repair work where the original bar is already cast in place.

Three Weld Types Used on Rebar

AWS D1.4, the structural welding code for reinforcing steel, recognizes several joint details, but three of them do essentially all the work on buildings and bridges. Knowing which one the drawing means matters, because each has a different capacity basis — and only one of them involves a weld that runs along the rebar rather than across it.

TypeGeometryTypical useStrength basis
Butt weld (CJP groove)Bar ends cut square or beveled, rooted and filled flush — the weld replaces the full bar cross-sectionStraight tension splices in columns, walls, and fabricated cages; the classic welded splice detailF = 0.6 × E × A_groove — a complete-joint-penetration weld acts on the full bar area
Lap fillet weld (2 sides)Two bars parallel in contact (or flared into a flare-bevel groove); fillet welds run along both sides of the joint line, and flare-bevel beads can wrap around the rebar circumferenceField splices, starter-bar extensions, cage assembly where bars cannot be butted end-to-endF = 0.6 × E × 0.707 × leg × length × 2 — effective throat at 45°, both sides working
Slot weldA fillet or plug weld laid through a slot in a plate or strap and onto the bar face beneathSplicing rebar to structural steel — beam flanges, embed plates, column base detailsShear through the slot area and weld throat; the plate and the weld share the design check
Welder running an arc on structural steel with sparks flying

The Weld Is a Structural Member

Every one of these details makes the weld itself a load-carrying member with a computable capacity — which is the whole point of a rebar welding calculation. The butt weld carries tension through its full cross-section, the two-sided fillet carries it through two shear throats, and the slot weld carries it through the slot. Once the geometry is known, the capacity is arithmetic; the craft is in making the deposited metal actually match the assumption.

Butt Weld Capacity: F = 0.6 × E70 × A_groove

BUTT WELD WORKING CAPACITY (KIPS)

F = 0.6 × Exx × Agroove

Exx is the electrode's tensile class in ksi (E60 = 60, E70 = 70), and Agroove is the welded cross-section in square inches — for a full-section butt weld, the bar's own area.

The 0.6 factor is the same derating structural welding has used for decades: an electrode rated 70 ksi in tension is trusted to only 0.6 × 70 = 42 ksi as a working stress through the weld throat, a margin that covers shear-on-the-throat behavior, residual stresses, and the reality of field-deposited metal. For E70 filler the effective design strength is therefore 42 ksi, and the butt weld's working capacity is simply 42 ksi times the area it actually fuses.

Run the defaults on the calculator: a #6 bar (0.44 sq in), Grade 60, E70 electrode. The weld works out to F = 0.6 × 70 × 0.44 = 18.48 kips, while the bar itself yields at T = 0.44 × 60 = 26.4 kips. The weld governs — it carries only about 70% of what the bar can deliver. That is the honest teaching point this guide keeps repeating: a simple butt check on the 0.6Fexx basis does not develop the bar. This is exactly why practical full-strength welded splices are not flush beads on square-cut ends — they are complete-joint-penetration bevel groove welds, ends prepared with an angle, rooted, and filled with matching-strength filler, detailed per AWS D1.4 so the splice develops at least 125% of the bar's yield as ACI requires for welded splices in tension. The 18.48-kip number is the working check that tells you the direction of the problem; the CJP detail is the solution.

Fillet Lap Weld Capacity: Two Sides of Support

FILLET LAP WELD CAPACITY, BOTH SIDES (KIPS)

F = 0.6 × Exx × 0.707 × leg × length × 2

leg = fillet leg size in inches, length = weld length per side in inches, and the trailing × 2 counts both sides of the joint working together.

The 0.707 is geometry, not empiricism: a fillet's strongest plane is its 45-degree throat, and the throat of a right-triangle fillet equals the leg times cos 45° = 0.707. So a 3/8-in fillet has an effective throat of 0.375 × 0.707 = 0.265 in, and every inch of weld length puts 0.265 sq in of weld metal into shear at the 42-ksi effective stress of E70 filler. Two bars lapped side by side get welds on both flanks — a flare-bevel detail lets the bead ride up around the rebar circumference — and both throats count, hence the × 2.

Now the calculator's fillet default: #6 bar, E70, 3/8-in legs, 4 inches per side. F = 0.6 × 70 × 0.707 × 0.375 × 4 × 2 = 89.08 ≈ 89.1 kips, against the bar's 26.4 kips of yield capacity. The bar governs by a factor of more than three — the two-sided fillet is enormously strong for its size, and the tile flips to BAR GOVERNS the moment you switch weld types. This is the field reality of the weld along rebar calculation capacity question: fillet splices almost never fail on capacity, so their design is governed by minimum length rules, bar spacing for electrode access, and the geometry of the joint — not by the weld's strength, which you effectively cannot exhaust on a single bar.

Minimum Weld Length: 5 Bar Diameters and 1 Inch

AWS D1.4 sets a floor on how short a rebar weld may be: the effective length must be at least 5 bar diameters and at least 1 inch, whichever is greater. The reason is stress concentration rather than average stress — load entering a weld funnels through its ends, where the stiffness of the bar meets the compliance of the bead, and a short weld concentrates that transfer into a fraction of an inch of metal with a crater at each end. Short welds crack at the craters; it is the signature failure of undersized splices, and it is why the code writes the minimum as a length requirement instead of trusting capacity math alone.

Bar sizeDiameter (in)5 × diameter (in)1 in checkGoverning minimum (in)
#30.3751.8751 < 1.88 → 5d governs1.88
#40.5002.5001 < 2.50 → 5d governs2.50
#50.6253.1251 < 3.13 → 5d governs3.13
#6This page's default0.7503.7501 < 3.75 → 5d governs3.75
#70.8754.3751 < 4.38 → 5d governs4.38
#81.0005.0001 < 5.00 → 5d governs5.00

Notice that 5 diameters beats 1 inch at every bar size from #3 to #8, so in everyday work the 5d rule is the rule. The calculator carries it underneath the fillet slider for exactly this reason: if you drag a #6 fillet weld down to 3 inches, the panel still flags the AWS minimum of 3.75 in. Capacity says the weld is fine; the code says the ends will crack — and the code has the crash history on its side.

Electrode Selection: Matching Filler to Bar Grade

The electrode is not an accessory — it is the filler metal that becomes the splice, and choosing it wrong quietly downgrades the joint. E6013, a 60-ksi general-purpose rutile rod, is acceptable for older Grade 40–50 bars on non-critical work where the weld is not asked to develop the bar. E7018 low-hydrogen is the standard choice for Grade 60 rebar and the required class for A706 weldable-grade bars: the 70-ksi filler overmatches the 60-ksi stock, and the low-hydrogen coating is what keeps the joint from cracking.

Why does hydrogen matter so much on rebar specifically? Because reinforcing steel lives outside, drinks humidity, and often gets welded damp at the restart of a shift. Hydrogen dissolved into hot weld metal escapes as it cools — except where it is trapped in the hardened heat-affected zone, where it collects at inclusions and grows cracks under residual stress, days after the welder has packed up. Low-hydrogen electrodes have baked coatings that emit almost no hydrogen; keep opened cans in a heated rod oven and discard rods that have gone soft, because a damp E7018 is worse than a dry E6013.

Preheat and the AWS D1.4 Essentials

Large bars — roughly #9 and up — and cold-weather welding need preheat, commonly in the 250°F class for big sections, so the heat-affected zone cools slowly enough to stay ductile. Beyond temperature, AWS D1.4 asks for four things on every job: a qualified weld procedure specification (WPS), welders qualified to it, 100% visual inspection of every rebar weld, and chemistry verification before welding standard A615 bars — the rolled and rail-steel grades whose carbon equivalent is unknown unless the mill cert says otherwise. A706 is the weldable grade precisely because its chemistry is capped at the mill, which is why the smart move is to specify A706 up front whenever the design anticipates welded splices.

Structural steel and rebar assembly on a construction site

One more grade note for completeness: when the design mixes rebar with structural steel — dowels welded to beam flanges, bars to embed plates — the electrode must satisfy both materials, which usually means the E70XX class and a joint detail the fabricator signs off on. The capacity math on this page still applies; the weld around rebar calculation simply uses the weakest of the connected parts as its target capacity.

Worked Verification: Two #6 Grade 60 Bars, Butt Weld

Set the calculator to its defaults and follow the same numbers on paper — this is the check an inspector or a detailer runs before approving the splice detail.

1

Bar properties

A #6 bar has a nominal area of 0.44 sq in and a diameter of 0.75 in. Grade 60 means the yield strength is 60 ksi — the capacity the splice is asked to match.

2

Effective weld strength

E70 electrode, derated by the 0.6 factor: 0.6 × 70 = 42 ksi effective working stress through the weld. This is the number all weld capacity arithmetic rides on.

3

Weld working capacity

F = 42 ksi × 0.44 sq in = 18.48 kips. A flush butt weld on the full #6 section carries 18.48 kips on the working basis — that is the weld's honest number.

4

Bar yield capacity

T = 0.44 sq in × 60 ksi = 26.4 kips. This is what the bar itself can deliver before it yields — and it is the target any splice is measured against, a relationship explored fully in our rebar tension capacity guide.

5

Conclusion — which governs

18.48 < 26.4, so the weld governs at about 70% of bar yield. For a splice that must develop the bar — and ACI asks welded tension splices to develop at least 125% of fy — the detail moves to a complete-joint-penetration bevel groove weld with matching filler per AWS D1.4. The working check told us where the weak link was; the CJP detail fixes it.

When Does Welding Beat a Lap Splice? The Break-Even

Put dollars on the two methods and the decision stops being philosophical. A lap splice on a #6 runs roughly 30 inches of doubled bar: 2.5 ft × 1.502 lb/ft ≈ 3.76 lb of extra steel, about $4–5 of material per splice at everyday bar prices — and it consumes zero skill, because any rodman can tie it. A butt weld needs an AWS D1.4-qualified welder, electrode time, and inspection: call it $12–20 per splice in labor and consumables on a production basis. Head to head on a single small-bar splice, the lap is cheaper by a wide margin.

The economics flip as bars grow and counts climb. Lap length scales with bar diameter, so the extra steel per splice grows roughly with the square of the bar number — a #8 lap burns more than four times the steel of a #5 lap at the same code minimum. Meanwhile the welder's time barely changes: a #8 butt weld takes minutes more than a #5, while the lap it replaces costs over 13 lb of steel. The break-even sits around #7 and larger bars, and welding pulls clearly ahead where splices repeat by the hundred — walls and columns with hundreds of splices, where saved lap steel compounds across the floor plate and the welder's productivity amortizes over the run. Small bars and one-off splices: lap. Big bars, tight cages, congested joints, and anything that must splice to structural steel: weld.

🔗 Run the Numbers End to End

A splice check is one line in a bigger takeoff. Size the whole member — bar counts, total length, weight, and cost — with the free rebar calculator, then work through the rest of the site's rebar calculation guides for laps, development, spirals, and pricing. Every guide uses the same bar areas and unit weights as the calculator above, so the numbers always reconcile.

💡 Tip: Spec A706 Early

If welding is even possible on the job, specify A706 weldable-grade bars at design time. Retrofitting chemistry verification onto delivered A615 bars costs mill certs, testing, and schedule; specifying A706 costs about a dollar per hundredweight and removes the argument.

⚠️ Warning: Unverified A615

Never weld unverified A615 rail-steel or rolled bars — their chemistry is unknown, the carbon equivalent may be high, and the heat-affected zone can harden and crack under load. Demand mill chemistry or a lab test before the first arc strike, or switch the splice detail.

❌ Don't: Tack-Weld as a Placeholder

Never tack-weld rebar to hold it in position "just until the ties go on." Unqualified tacks from unqualified hands create notches and hard spots that crack under load — the bar fails at the tack, not at the design section. Tie wire and chairs exist for exactly this reason.

Rebar Welding FAQ

Top QuestionCan welding replace lap splices in rebar?▼

Yes — when the work is done under AWS D1.4 with qualified weld procedures, qualified welders, and inspection. ACI 318 treats a welded splice as a form of mechanical splice and requires a welded tension splice to develop at least 125% of the specified yield strength of the bar. The two catches are chemistry and economics: standard A615 bars must have mill chemistry verified before any arc strikes (or you specify A706, the weldable grade), and the welder-plus-inspection labor makes welding most attractive on larger bars and high splice counts. On #3–#5 bars a 30-bar-diameter lap is almost always cheaper. The capacity math on this page shows why the check matters: a simple butt-weld rating on a #6 computes 18.48 kips against the bar's 26.4 kip yield capacity, so full-strength splices rely on complete-joint-penetration groove welds, not flush fillet-sized beads.

How strong is a butt-welded #6 splice?▼

On the working-strength basis F = 0.6 × E70 × A_bar, a butt weld on a #6 carries 0.6 × 70 × 0.44 = 18.48 kips, against the bar's yield capacity T = 0.44 × 60 = 26.4 kips — the weld governs at roughly 70% of bar yield. That is the honest teaching point of the calculator above: a simple butt check on the 0.6Fexx basis does not develop the bar by itself. Practical full-strength butt splices use complete-joint-penetration bevel groove welds with matching-strength filler, detailed and inspected per AWS D1.4 so the splice develops at least 125% of fy as ACI requires for welded splices in tension.

Do welded rebar splices need hooks or 180-degree bends?▼

No. The weld is the splice — force crosses through weld metal, not through concrete bond over an overlapped length, so there is no lap to hook. Hooks and 180-degree bends belong to anchorage and development problems (a bar hooked into a footing or a beam-column joint), not to splicing. Removing hooks is actually one of welding's quiet benefits: a butt-welded cage is shorter and easier to place than a lapped cage, the splice adds almost no length to the member, and congestion at the joint drops because there are no doubled bars to tie.

Does a rebar weld need testing?▼

Yes. AWS D1.4 makes 100% visual inspection the baseline for rebar welds — profile, cracks, porosity, fusion at the bar edges, and undercut all get checked on every weld. For critical full-penetration groove welds the specification typically adds nondestructive testing such as ultrasonic testing on a sampled or 100% basis, and bend tests of production coupons where called out. What is never acceptable is waving a weld through because it looks fine from ten feet: rebar steel's variable chemistry makes hydrogen cracking and fusion failures realistic, and both are catchable only by an inspector who actually looks — or listens with a UT probe.

Can Grade 75 rebar be welded?▼

Only with the right bar, the right filler, and a qualified procedure. Weldable-grade A706 bars carry controlled, capped carbon-equivalent chemistry precisely so they can be welded; standard A615 Grade 75 rail and rolled bars must have mill chemistry verified before welding, and on many heats the answer is no. Filler moves up a class as well — an E8018 low-hydrogen class matches 80-ksi weldable stock — with a qualified WPS, preheat on large bars, and 100% visual inspection per AWS D1.4. Never weld standard A615 Grade 75 blind: with an unknown carbon equivalent, hardening and cracking in the heat-affected zone is a real and unforgiving risk.

What electrode for Grade 60 rebar?▼

E7018 low-hydrogen is the standard choice for Grade 60 rebar: the 70-ksi filler class overmatches the 60-ksi bar, and the low-hydrogen coating keeps moisture-driven hydrogen out of the weld — hydrogen cracking is the signature failure mode of rebar welding because bar steel lives outside and drinks moisture. E6013, a 60-ksi general-purpose electrode, is acceptable on older Grade 40–50 bars for non-critical work. Whatever the class, keep opened electrodes in a heated rod oven, and note that A706 weldable-grade bars are also welded with E7018 — the low-hydrogen coating is the point, not an option.

How long must a fillet weld along rebar be?▼

AWS D1.4 sets the minimum effective length of a rebar weld at the greater of 5 bar diameters or 1 inch. On a #6 (0.75-in diameter) that is 3.75 in; on a #8 it is 5.0 in. The table in this guide lists the full #3–#8 run: 1.875, 2.5, 3.125, 3.75, 4.375, and 5.0 inches — 5 diameters governs at every size. Short welds are banned because load funnels through the weld ends and a too-short bead cracks at its craters. In practice, length rather than capacity governs fillet lap splice design: two 3/8-in fillets 4 in long already carry about 89 kips, far past any single bar they touch.

Is it cheaper to weld or lap splice rebar?▼

It depends on bar size and splice count. A 30-inch lap on a #6 burns about 3.76 lb of extra bar — roughly $4–5 of steel per splice — and any rodman can tie it. A butt weld costs roughly $12–20 per splice in qualified-welder time and consumables, plus inspection. Below about #7, laps win; the break-even sits around #7 and larger, and welding pulls clearly ahead where splice counts are high — walls and columns with hundreds of splices — because the saved lap steel compounds and the welder's productivity amortizes across the run. Small bars and one-off splices: lap. Big bars, tight cages, congested joints, and splices to structural steel: weld.

Related Splice, Strength & Rebar Guides

⚖️

How to Calculate Rebar Weight

Master 3 core rebar weight calculation methods: volume × den...

⭕

How to Calculate Rebar Area

Complete guide to calculating rebar cross-sectional area usi...

📏

How to Calculate Rebar Diameter & Size

Complete guide to rebar diameter calculation, size selection...

🔲

How to Calculate Rebar Spacing

Multi-dimensional comparison of rebar size and spacing combi...

🔗

How to Calculate Rebar Lap Length

Step-by-step SOP for calculating rebar lap length and develo...

⭕

How to Calculate Rebar in Circular Slab

Scenario-based deconstruction of rebar layout in circular sl...

🏛️

How to Calculate Rebar in Column

Multi-dimensional comparison matrix of column reinforcement:...

🧱

How to Calculate Rebar in Retaining Wall

Step-by-step SOP for cantilever retaining wall rebar: stem v...

🏢

How to Calculate Rebar in Concrete Wall

Scenario-card diagnosis of concrete wall rebar: single vs do...

🧱

How to Calculate Rebar for Brick Wall

Decision-tree guide to brick wall masonry reinforcement: hor...

📐

How to Calculate Rebar in Odd Shapes

Interactive terminal guide to rebar in odd shapes: decompose...

🌉

How to Calculate Rebar Size in Beam

Scenario-card guide to beam rebar: bottom tension steel by t...

💪

How to Calculate Tension Capacity of Rebar

Scenario-card guide to rebar tension capacity: the T = As × ...

🧪

How to Calculate Tensile Strength of Rebar

Interactive terminal guide to rebar tensile strength: ASTM A...

🎯

How to Calculate Yield Stress for Rebar

Decision-tree guide to rebar yield stress: 0.2% offset metho...

📈

How to Calculate Stress in Rebar

Multi-dimensional comparison matrix of rebar stress calculat...

🔋

How to Calculate Force in Rebar

Scenario-card deconstruction of rebar force calculation: F =...

✂️

How to Calculate Shear Strength of Rebar

Interactive terminal guide to rebar shear strength: stirrup ...

⚖️

How to Calculate Moment for Rebar in Slab

Step-by-step SOP for calculating moment for rebar in a concr...

🔗

How to Calculate Tie Wire & Ties for Rebar

Decision-tree guide to rebar tie wire quantity: grid interse...

🪑

How to Calculate Rebar Chairs

Interactive terminal guide to rebar chair quantity: one chai...

♻️

How to Calculate Waste for Rebar

Multi-dimensional comparison matrix of rebar waste: 10–15% w...

🕷️

How to Calculate Rebar for Spider Tie

Step-by-step SOP for spider tie rebar: spider bar use and st...

🌀

How to Calculate Bend Radius of Rebar

Scenario-card guide to rebar bend radius: ACI 4d standard ho...

➰

How to Calculate Spiral Rebar Length

Empirical terminal guide to spiral rebar length: the L = n ×...

🖥️

How to Calculate Rebar and Concrete with PlanSwift

Decision-tree takeoff guide for PlanSwift rebar and concrete...

🧮

How to Calculate Total of Rebar Construction Master Pro

Keystroke-level diagnostic guide to rebar math on the Constr...

🏗️

How to Calculate Rebar Weight in Revit

Multi-dimensional comparison matrix of four Revit rebar weig...

🏆

What Is the Best Rebar Calculator

Step-by-step SOP for choosing the best rebar calculator in 2...

💰

How to Calculate Rebar Price

Dashboard guide to rebar price calculation: price sources co...

🔢

How to Calculate Rebar Quantity

Stock-length scenario cards for rebar quantity: the total-le...

🟦

How to Calculate Rebar for Slab

Five-step slab rebar guide: grid layout and spacing choice, ...

🧱

How to Calculate Rebar for Footings

Decision-tree footing guide: strip vs spread vs mat type ide...

📖

What Is Rebar? Why Concrete Needs It & Placement Basics

The rebar encyclopedia for beginners: what reinforcing bars ...

📘

Bluebeam Rebar Calculation

Bluebeam Revu rebar takeoff workflow: PDF import and scale c...